Amherst Pepsi Center

Amherst Pepsi CenterWhen the Amherst Pepsi Center had a gas leak to repair, they needed service, and fast. The repair had to be made overnight so the center could open as scheduled the next day.

Due to a lack of gas shut-off valves in the current system, a complete gas shutdown of the entire building was necessary. The shutdown started at 10PM and lasted until 5AM the next morning. In order to get this job done right on this tight schedule, Danforth was able to utilize our own Fab Shop. Pre-measuring the piping, welding, fabricating the replacement pieces at Danforth’s warehouse, ensured the job was completed in the time allotted.

Danforth took the challenge and created a solution.