IMA Life Pharmaceutical Cleanroom & Laboratory Design-Build

Owner: IMA Life
Danforth’s Role: Design & Build Contractor
Contract Value: $104,000
Date Completed: April 2011

IMA Life Pharmaceutical Cleanroom & Laboratory Design-Build

IMA Life Pharmaceutical Cleanroom & Laboratory Design-Build


IMA Life Pharmaceutical Cleanroom & Laboratory Design-Build Services

Danforth has expanded their capabilities to provide Cleanroom and Laboratory Solutions. We recently designed and built a Hard Wall Cleanroom inside a larger Fixed Cleanroom for IMA Life, a leader in the field of Pharmaceutical Aseptic Processing & Freeze Drying Solutions. Danforth designed the Cleanrooms and used AutoCAD Software to layout the HVAC system.

The HVAC system includes a dehumidification system to maintain critical temperature and humidity levels required for research and testing. Danforth also installed HEPA filtration systems to maintain strict cleanliness levels in the space. Also included in the system are space pressure monitoring and temperature/humidity sensors. Danforth was also tasked with the challenge of incorporating IMA Life’s freeze drying equipment into the Cleanroom design.

Upon completion of the installation, Danforth provided all the commissioning, balancing, and certification of the new space and turned the facilities over to the client. The Danforth Team also does annual certifications of the Cleanrooms to ISO 14644 Standards.


IMA Life Cleanroom Design-Build Project Case Study (285 KB)

IMA Life Cleanroom Design-Build Project Case Study (285 KB)

This case study outlines work done at IMA Life, showcasing Danforth’s expertise in Cleanroom Design-Build and Certification.

IMA Life Cleanroom Design-Build Project Case Study (285 KB)